ABOUT CAST IN SITU PILES IN DHAKA

About Cast in Situ Piles in Dhaka

The 25mm thick significant metal tube is pushed Together with the stop shut by a metal shoe. On achieving the necessary driving resistance, a full size cage is reduced in into the tube and stuffed with large slump concrete. The tube is then vibrated out leaving a shaft of concrete.The withdrawn tube is equipped having a Exclusive flat iron shoe and

read more